Ivanhoe Electric Inc. (0001879016) (Filer)
SEC · EDGAR 财务披露 · November 19, 2026 at 7:14 AM ET
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 8-K
CURRENT REPORT
Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934
Date of Report (Date of earliest event reported): November 19, 2026
IVANHOE ELECTRIC INC.
(Exact name of registrant as specified in its charter)
| Delaware | 001-41436 | 32-0633823 | ||
| (State or other jurisdiction of incorporation or organization) |
(Commission File Number) | (I.R.S. Employer Identification No.) |
| 450 E. Rio Salado Parkway, Suite 130, Tempe, AZ | 85281 | |
| (Address of principal executive offices) | (Zip Code) | |
Registrant’s telephone number, including area code: (480) 656-5821
(Former name or former address, if changed since last report)
Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions:
| ¨ | Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425) |
| ¨ | Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12) |
| ¨ | Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b)) |
| ¨ | Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c)) |
Securities registered pursuant to Section 12(b) of the Act:
| Title of each class | Trading Symbol(s) | Name of each exchange on which registered | ||
| Common Stock, par value $0.0001 per share | IE | NYSE American |
Indicate by check mark whether the registrant is an emerging growth company as defined in Rule 405 of the Securities Act of 1933 (§230.405 of this chapter) or Rule 12b-2 of the Securities Exchange Act of 1934 (§240.12b-2 of this chapter).
Emerging growth company ¨
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ¨
Item 7.01 Regulation FD Disclosure.
On November 19, 2026, Ivanhoe Electric Inc. (“Ivanhoe Electric” or the “Company”) issued a press release reporting the initial drill results from the Company’s Gleeson Copper-Gold Project (“Gleeson”) in southeastern Arizona. A copy of the press release is furnished as Exhibit 99.1 to this Form 8-K.
The information contained in Exhibit 99.1 hereto shall not be deemed “filed” for purposes of Section 18 of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), or otherwise subject to the liabilities of that section, nor shall it be deemed incorporated by reference into any other filing under the Securities Act of 1933, as amended, or the Exchange Act, except as expressly set forth by specific reference in such a filing.
Item 8.01 Other Events.
On November 19, 2026, the Company announced initial drill results from Gleeson. Gleeson is the Company’s highest priority exploration project. Results from the first eleven completed drill holes have discovered two separate, significant mineralized domains below low angle faulting. Copper-gold-silver breccia has been logged in drill holes spanning an area of approximately 500 by 500 meters, from 600 meters depth pinching out in the east to over 380 meters downhole thickness in the south-west. The breccia remains open in multiple directions. Below 1,000 meters depth, intrusive and carbonate replacement hosted copper-gold-silver-zinc mineralization has been discovered with mineralization logged in drillholes over 800 meters of north to south extent, 600 meters east to west and a strong vector to the west.
Highlights from the first holes include a significant interval in drill hole CGD26-TR-003, which also contained very high-grade copper-gold mineralization over shorter intervals (Photo 1)
| · | Hole CGD26-TR-003: 123.60 meters at 0.91% copper, 0.44 g/t of gold and 5.27 g/t of silver from 601.70 meters, including: |
| ○ | 71.03 meters at 1.38% copper, 0.52 g/t of gold and 6.73 g/t of silver from 640.32 meters. |
Photo 1: High-grade gold, copper and iron-sulfide mineralization in sample TR-003.0437 from the upper breccia domain grading 6.92% copper, 8.88 g/t of gold and 17.25 g/t of silver over 1.13 meters from 674.07 meters in hole CGD26-TR-003.

Assay results from the first nine of eleven completed drill holes also include longer mineralized intervals at similar shallow depths within the breccia and contain shorter sub-intervals at higher grades. The breccia interval in CGD26-TR-008, around 250 meters southwest of CGD26-TR-003 returned:
| · | Hole CGD26-TR-008: 381.66 meters at 0.34% copper, 0.29 g/t of gold and 1.07 g/t of silver from 587.85 meters, including: |
| ○ | 16.20 meters at 1.04% copper, 0.27 g/t of gold and 1.38 g/t of silver from 729.00 meters; and |
| ○ | 41.51 meters at 0.38% copper, 1.23 g/t of gold and 1.78 g/t of silver from 928.00 meters |
The primary focus of Ivanhoe Electric’s exploration efforts at Gleeson is on delineating the potential continuity and extensions of these mineralized domains. Initial drilling suggests an orientation to the southwest with the mineralization open in several directions. The possibility exists for several mineralized centers at Gleeson.
Additional drilling shows visible sulfide mineralization in both breccia and carbonate-replacement domains, with assays expected in the coming weeks.
Holes CGD26-TR-008 and CGD26-TR-009 have intersected zones of carbonate replacement mineralization from depths of approximately 1,250 meters (Photos 2, 3 and 4). Assays are in progress with results expected before the end of 2026.
Photo 2: CGD26-TR-008 at 1,263.80 meters, massive sulfide carbonate replacement containing pyrite and chalcopyrite, assays pending.

Photo 3: CGD26-TR-008 at 1,290.80 meters, semi-massive sulfide carbonate replacement containing sphalerite and galena, assays pending.

Photo 4: CGD26-TR-008 at 1,304.50 meters, massive sulfide carbonate replacement containing visible chalcopyrite and pyrite, assays pending.

The shallower breccia mineralization domain is also present in holes CGD26-TR-009 (Photo 5) and CGD26-TR-010 from depths of around 600 meters.
Photo 5: CGD26-TR-009 at 698.90 meters, breccia containing pyrite and chalcopyrite, assays pending.

Visual observations described above and shown in Photos 2–5 are of sulfide minerals in drill core for which assays are pending, with results expected as soon as possible. Visual observations are not a substitute for laboratory analysis, and the presence of sulfide minerals does not indicate grade.
The Gleeson Copper-Gold Project is an emerging copper-gold district north of the historic Bisbee Mining District covering approximately 20,000 acres of mineral rights and 2,000 acres of private surface rights held by Ivanhoe Electric.
The Gleeson Copper-Gold Project is located within the historic Courtland-Gleeson Mining District, approximately 28 miles north of Bisbee (Figure 1).
Ivanhoe Electric started acquiring mineral and surface rights in 2024, and currently controls over 19,606 acres of mineral rights and 2,033 acres of private surface rights. Current and planned drilling activities at the Gleeson Copper-Gold Project are occurring entirely on private land controlled by Ivanhoe Electric.
Figure 1. Location map of the Gleeson Copper-Gold Project in southeastern Arizona.

The world-famous Bisbee Mining District to the south of Gleeson produced almost continuously from 1880 to 2013, exploiting porphyry and breccia-hosted mineralization intruded into limestones with carbonate-replacement and skarn-type deposits. Over its 133-year life, over 207 million tonnes of ore was mined yielding approximately 8.2 billion pounds of copper, 2.8 million ounces of gold, 105 million ounces of silver, 145,000 tonnes of lead, and 161,000 tonnes of zinc, making it Arizona's largest gold producer, top lead producer, and second-largest silver producer.
Exploration drilling at the Gleeson Copper-Gold Project intersected a significant copper-gold-silver mineralized system from a depth of 600 meters.
Complete assay results have been received for the first seven holes, with partial results received for two holes and assays pending for the remaining four, including those in progress (Figure 2, Table 1 and Table 2). Ivanhoe Electric’s drilling plan at Gleeson for the remainder of 2026 includes expanding the program to complete a total of 16,000 meters of drilling by the end of 2026. Drilling began in November 2025.
Figure 2. Collar Locations and Drill Traces of Ongoing Ivanhoe Electric Drilling at the Gleeson Copper-Gold Project.

Two mineralized domains have been intersected below a low-angle fault, from a depth of 600 meters (Figures 3 and 4):
| · | an upper breccia domain from 600 meters depth that structurally pinches out to the east and broadens to the west. The breccia incorporates fragments of earlier skarn and carbonate-replacement mineralization, intrusions and sediments which are then overprinted by multiple strong copper, gold and silver mineralizing events; and |
| · | a deeper domain of intrusive-hosted, skarn, and carbonate-replacement mineralization beginning at approximately 1,000 meters depth, with a strong vector from narrow, gold-silver-zinc-lead mineralization in CGD26-TR-003, representing a metal signature further from the source, contrasted by closer to source metal assemblages with copper-gold-silver dominant mineralization in holes CGD25-TR-001 and CGD26-TR-002. |
Figure 3. West to east cross-section through a section of the Gleeson Copper-Gold Project showing completed and ongoing drill holes, with simplified geology and assay results received.
Figure 4. North to south cross-section through a section of the Gleeson Copper-Gold Project showing completed and ongoing drill holes, with simplified geology and assay results received.

Table 1: All intervals from the assayed holes that meet the reporting criteria and one interval reported for geological context (*) described below.1
| DRILL HOLE | FROM (m) |
TO (m) |
LENGTH (m) |
COPPER (%) |
GOLD (g/t) |
SILVER (g/t) |
Copper Equivalent (%) |
| CGD25-TR-001 | 641.36 | 654.70 | 13.34 | 0.50 | 0.18 | 1.08 | 0.72 |
| And | 831.40 | 932.00 | 100.60 | 0.30 | 0.13 | 2.56 | 0.47 |
| Including | 883.20 | 911.96 | 28.76 | 0.45 | 0.26 | 2.71 | 0.77 |
| And | 1,058.58 | 1,443.92 | 385.34 | 0.33 | 0.22 | 6.29 | 0.66 |
| Including | 1,292.96 | 1,312.11 | 19.15 | 1.16 | 0.38 | 16.82 | 1.83 |
| And Including | 1,388.55 | 1,433.09 | 44.54 | 0.69 | 0.82 | 17.77 | 1.85 |
| CGD26-TR-002 | 1,142.93 | 1,163.54 | 20.61 | 0.76 | 0.52 | 5.78 | 1.41 |
| And | 1,282.45 | 1,293.94 | 11.49 | 1.17 | 0.40 | 14.62 | 1.82 |
| CGD26-TR-003 | 601.70 | 725.30 | 123.60 | 0.91 | 0.44 | 5.27 | 1.47 |
| Including | 640.32 | 711.35 | 71.03 | 1.38 | 0.52 | 6.73 | 2.04 |
| And* | 1,441.81 | 1,444.80 | 2.99 | 0.16 | 3.93 | 105.83 | 6.03 |
| CGD26-TR-006 | 558.39 | 834.22 | 275.83 | 0.26 | 0.17 | 1.81 | 0.47 |
| Including | 670.97 | 681.88 | 10.91 | 0.49 | 0.25 | 0.79 | 0.77 |
| And Including | 782.00 | 825.51 | 43.51 | 0.41 | 0.42 | 3.54 | 0.92 |
| CGD26-TR-008 | 587.85 | 969.51 | 381.66 | 0.34 | 0.29 | 1.07 | 0.67 |
| Including | 606.83 | 619.85 | 13.02 | 0.56 | 0.23 | 3.09 | 0.85 |
| And Including | 729.00 | 745.20 | 16.20 | 1.04 | 0.27 | 1.38 | 1.35 |
| And Including | 928.00 | 969.51 | 41.51 | 0.38 | 1.23 | 1.78 | 1.74 |
Table 2: Drill Hole Location Information for all holes completed or in progress at the Gleeson Copper-Gold Project.2
| DRILL HOLE | STATUS | DEPTH (m) |
Azimuth (°) |
Dip (°) |
Easting (m) |
Northing (m) |
Elevation (m) |
| CGD25-GR-001 | Complete, No intervals meeting reporting criteria | 292.82 | 255 | -65 | 611515 | 3511990 | 1548 |
| CGD25-TR-001 | Complete | 1726.97 | 80 | -82 | 610291 | 3513569 | 1519 |
| CGD26-TR-002 | Complete | 1667.87 | 260 | -82 | 610289 | 3513583 | 1519 |
| CGD26-TR-003 | Complete | 1615.44 | 65 | -82 | 610554 | 3513479 | 1518 |
| CGD26-TR-004 | Complete, No intervals meeting reporting criteria | 2003.15 | 63 | -82 | 608923 | 3513580 | 1567 |
| CGD26-TR-005 | Complete, No intervals meeting reporting criteria | 872.34 | 70 | -70 | 610550 | 3513482 | 1518 |
| CGD26-TR-006 | Complete | 1055.22 | 260 | -88 | 610553 | 3513488 | 1519 |
| CGD26-TR-007 | Complete, Partial assays received (to 445.82 meters) | 786.84 | 90 | -80 | 610529 | 3513702 | 1523 |
| CGD26-TR-008 | Complete, Partial assays received (to 974.45 meters) | 1847.12 | 180 | -78 | 610556 | 3513483 | 1516 |
| CGD26-TR-009 | Complete, Assays Pending | 1662.38 | 300 | -80 | 610530 | 3513701 | 1523 |
| CGD26-TR-010 | Complete, Assays Pending | 854.05 | 350 | -88 | 610530 | 3513701 | 1523 |
| CGD26-TR-011 | Drilling in progress | 417.50 | 125 | -80 | 610556 | 3513483 | 1516 |
| CGD26-TR-012 | Drilling in progress | 9.74 | 335 | -75 | 610530 | 3513701 | 1523 |
1 Notes to Table 1: Reported intervals are length-weighted averages calculated using a 0.25% CuEq cut-off, a minimum downhole length of 100 meters, and a maximum cumulative internal dilution of 35% of interval length. Higher-grade sub-intervals use a 0.50% CuEq cut-off, a minimum length of 10 meters, and a maximum cumulative internal dilution of 20%. Intervals start and end on samples at or above cut-off, and each segment from either end through any such sample averages at least cut-off. The longest interval meeting these criteria is reported. No grade capping was applied. Unsampled intervals due to lost core were assigned zero grade and included in composites.
Higher-grade intervals that fall outside a reported broad interval are reported as separate intervals (e.g., CGD25-TR-001 and CGD26-TR-002).
*Reported for geological context; does not meet the 10-meter minimum length. This 2.99-meter interval from 1,441.81 meters also contains 6.70% zinc and 1.31% lead, which are not included in CuEq, and is relevant to the metal vectors described in the text.
Intervals are downhole lengths; true widths are unknown.
CuEq includes copper, gold, and silver only and is calculated as: CuEq (%) = Cu (%) + (1.08505 × Au (g/t)) + (0.01518 × Ag (g/t)), using consensus long-term prices of $4.86/lb copper, $3,616/oz gold, and $50.59/oz silver from CIBC Global Mining Group guidance dated August 1, 2026.
CuEq assumes 100% recovery of each included metal. No metallurgical testwork has been completed, and actual recoveries are unknown. CuEq is used for comparison purposes only and the reported CuEq values may not be representative of recoverable or economically recoverable metal.
2 Note to Table 2: Drill hole coordinates are in the following projected coordinate system: North American Datum of 1983, Universal Transverse Mercator Projection, Zone 12 North (NAD1983, UTM 12N)
*Depths for holes in progress (CGD26-TR-011 and CGD26-TR-012) are reported as of November 12th, 2026.
Item 9.01 Financial Statements and Exhibits.
(d) Exhibits.
| Exhibit No. | Description | |
| 99.1 | Press Release dated November 19, 2026 | |
| 104 | Cover Page Interactive Data File (embedded with the inline XBRL document) |
Forward-Looking Statements
Certain statements in this Current Report on Form 8-K (“Form 8-K”) constitute “forward-looking statements” or “forward-looking information” within the meaning of applicable U.S. and Canadian securities laws. Such statements and information involve known and unknown risks, uncertainties and other factors that may cause the actual results, performance or achievements of Ivanhoe Electric, its projects, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. Such statements can be identified by the use of words such as “may”, “would”, “could”, “will”, “intend”, “expect”, “believe”, “plan”, “anticipate”, “estimate”, “scheduled”, “forecast”, “predict”, “target”, “project” and other similar terminology, or state that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. These statements reflect Ivanhoe Electric’s current expectations regarding future events, performance and results and speak only as of the date of this Form 8-K. Such statements in this Form 8-K include, without limitation, statements relating to: the timing and receipt of pending assay results; planned and ongoing drilling at the Gleeson Copper-Gold Project, including the plan to complete a total of 16,000 meters of drilling by the end of 2026, since the program began in November 2025; the interpretation of the orientation, continuity and extent of mineralization and the location of the source of the mineralizing system; and the results of surveying, drilling and other exploration activities. The Bisbee Mining District is not part of the Gleeson Copper-Gold Project, and mineralization and historic production at Bisbee are not indicative of mineralization or potential at the Gleeson Copper-Gold Project.
Forward-looking statements are based on management’s beliefs and assumptions and on information currently available to management. Such statements are subject to significant risks and uncertainties, and actual results may differ materially from those expressed or implied in the forward-looking statements due to various factors, including changes in the prices of copper or other metals Ivanhoe Electric is exploring for; the results of exploration and drilling activities and/or the failure of exploration programs or studies to deliver anticipated results or results that would justify and support continued exploration, studies, development or operations; the final assessment of exploration results and information that is preliminary; the significant risk and hazards associated with any future mining operations, extensive regulation by the U.S. government as well as local governments; changes in laws, rules or regulations, or their enforcement by applicable authorities; the failure of parties to contracts with Ivanhoe Electric to perform as agreed; and the impact of political, economic and other uncertainties associated with operating in foreign countries, and the global economy. These factors should not be construed as exhaustive and should be read in conjunction with the other cautionary statements and risk factors described in Ivanhoe Electric’s Annual Report on Form 10-K filed and other disclosures with the U.S. Securities and Exchange Commission.
No assurance can be given that such future results will be achieved. Forward-looking statements speak only as of the date of this Form 8-K. Ivanhoe Electric cautions you not to place undue reliance on these forward-looking statements. Subject to applicable securities laws, Ivanhoe Electric does not assume any obligation to update or revise the forward-looking statements contained herein to reflect events or circumstances occurring after the date of this Form 8-K, and Ivanhoe Electric expressly disclaims any requirement to do so.
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.
| IVANHOE ELECTRIC INC. | ||
| Date: November 19, 2026 | By: | /s/ Taylor Melvin |
| Taylor Melvin | ||
| President and Chief Executive Officer | ||