TAMPA ELECTRIC CO (0000096271) (Filer)
SEC · EDGAR 财务披露 · November 6, 2026 at 6:05 AM ET
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, D.C. 20549
FORM 10-Q
☒ |
QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the quarterly period ended September 30, 2026
OR
☐ |
TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the transition period from to
Commission File No |
Exact name of each registrant as specified in its charter, state of incorporation, address of principal executive offices, telephone number |
I.R.S. Employer Identification Number |
||
1-5007 |
TAMPA ELECTRIC COMPANY |
59-0475140 |
||
(a Florida corporation) Midtown East Tower 3600 Midtown Drive Tampa, Florida 33607 (813) 228-1111 |
Securities registered or to be registered pursuant to Section 12(b) of the Act:
Title of each class |
Trading symbol(s) |
Name of each exchange on which registered |
||
None. |
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes ☒ NO ☐
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). Yes ☒ NO ☐
Indicate by check mark whether Tampa Electric Company is a large accelerated filer, an accelerated filer, a non-accelerated filer, smaller reporting company, or an emerging growth company. See definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
Large accelerated filer |
☐ |
Accelerated filer |
☐ |
|||
Non-accelerated filer |
☒ |
Smaller reporting company |
☐ |
|||
Emerging growth company |
☐ |
|||||
If an emerging growth company, indicate by check mark whether Tampa Electric Company has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐
Indicate by check mark whether Tampa Electric Company is a shell company (as defined in Rule 12b-2 of the Exchange Act). YES ☐ NO ☒
As of November 5, 2026, there were 10 shares of Tampa Electric Company’s common stock issued and outstanding, all of which were held, beneficially and of record, by TECO Holdings, Inc.
Tampa Electric Company meets the conditions set forth in General Instruction (H)(1)(a) and (b) of Form 10-Q and is therefore filing this form with the reduced disclosure format specified in General Instruction H(2) of Form 10-Q.
ACRONYMS
Acronyms used in this and other filings with the U.S. Securities and Exchange Commission in 2026 and 2025 include the following:
Term |
Meaning |
|
AFUDC |
allowance for funds used during construction |
|
AFUDC-debt |
debt component of allowance for funds used during construction |
|
AFUDC-equity |
equity component of allowance for funds used during construction |
|
APBO |
accumulated postretirement benefit obligation |
|
ARO |
asset retirement obligation |
|
ASC |
Accounting Standards Codification |
|
ASU |
Accounting Standards Update |
|
CCRs |
coal combustion residuals |
|
CO2 |
carbon dioxide |
|
Emera |
Emera Inc., a geographically diverse energy and services company headquartered in Nova Scotia, Canada and the indirect parent company of Tampa Electric Company |
|
EPA |
U.S. Environmental Protection Agency |
|
ERISA |
Employee Retirement Income Security Act |
|
EUSHI |
Emera US Holdings Inc., a wholly owned subsidiary of Emera, which is the sole shareholder of TECO Holdings’ common stock as of April 1, 2024, and the sole shareholder of TECO Energy's common stock prior to April 1, 2024 |
|
FASB |
Financial Accounting Standards Board |
|
FDEP |
Florida Department of Environmental Protection |
|
FERC |
Federal Energy Regulatory Commission |
|
FPSC |
Florida Public Service Commission |
|
GHG |
greenhouse gas |
|
IRS |
Internal Revenue Service |
|
IT |
information technology |
|
ITCs |
investment tax credits |
|
MD&A |
the section of this report entitled Management’s Discussion and Analysis of Financial Condition and Results of Operations |
|
MGP |
manufactured gas plant |
|
MMBTU |
one million British Thermal Units |
|
MW |
megawatt(s) |
|
MWH |
megawatt-hour(s) |
|
NAV |
net asset value |
|
Note |
Note to financial statements |
|
NPNS |
normal purchase normal sale |
|
O&M expenses |
operations and maintenance expenses |
|
OCI |
other comprehensive income |
|
OBBBA |
One Big Beautiful Bill Act |
|
OPEB |
other postemployment benefits |
|
Parent |
the direct parent company of Tampa Electric Company, which is TECO Holdings, Inc. as of April 1, 2024, and TECO Energy, Inc., prior to April 1, 2024 |
|
PBO |
projected benefit obligation |
|
PGS |
Peoples Gas System, the former gas division of Tampa Electric Company |
|
PGSI |
Peoples Gas System, Inc. |
|
PPA |
power purchase agreement |
|
PP&E |
property, plant and equipment |
|
PTCs |
production tax credits |
|
ROE |
return on common equity |
|
Regulatory ROE |
return on common equity as determined for regulatory purposes |
|
ROU |
right-of-use |
|
S&P |
Standard and Poor’s |
|
SEC |
U.S. Securities and Exchange Commission |
|
SERP |
Supplemental Executive Retirement Plan |
|
TEC |
Tampa Electric Company |
|
TECO Energy |
TECO Energy, Inc., the direct parent company of Tampa Electric Company prior to April 1, 2024 |
|
TECO Holdings |
TECO Holdings, Inc., the direct parent company of Tampa Electric Company as of April 1, 2024 |
|
U.S. GAAP |
generally accepted accounting principles in the United States |
2
CAUTIONARY STATEMENTS REGARDING FORWARD-LOOKING INFORMATION
This Form 10-Q contains certain forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995 that are subject to risks and uncertainties. Forward-looking statements generally can be identified by words such as "anticipates," "believes," "estimates," "expects," "intends," "plans," "predicts," "projects," "will be," "will continue," "may," "could," "will likely result," and similar expressions. The factors that could cause actual results to differ materially from the forward-looking statements made by TEC include those factors discussed herein, including those factors discussed with respect to TEC in (1) TEC’s 2025 Annual Report on Form 10-K in (a) Part I, Item 1A. Risk Factors, (b) Part II, Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations and (c) Part II, Item 8. Financial Statements: Note 8, Commitments and Contingencies; (2) this Quarterly Report on Form 10-Q in (a) Part I, Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations and (b) Part I, Item 1. Financial Statements: Note 8, Commitments and Contingencies, and (3) other factors discussed in filings with the SEC by TEC. Readers are cautioned not to place undue reliance on these forward-looking statements, which apply only as of the date of this Report. TEC does not undertake any obligation to publicly release any revision to its forward-looking statements to reflect events or circumstances after the date of this Form 10-Q.
All references to “dollars” and “$” in this and other filings with the U.S. Securities and Exchange Commission are references to U.S. dollars, unless specifically indicated otherwise.
3
PART I. FINANCIAL INFORMATION
Item 1. FINANCIAL STATEMENTS
TAMPA ELECTRIC COMPANY
Condensed Balance Sheets
Unaudited
(millions) |
September 30, |
December 31, |
||||||
Assets |
2026 |
2025 |
||||||
Property, plant and equipment |
||||||||
Utility plant, at original costs |
$ |
16,900 |
$ |
15,787 |
||||
Accumulated depreciation |
(3,873 |
) |
(3,626 |
) |
||||
Utility plant, net |
13,027 |
12,161 |
||||||
Other property |
28 |
20 |
||||||
Total property, plant and equipment, net |
13,055 |
12,181 |
||||||
Current assets |
||||||||
Cash and cash equivalents |
11 |
3 |
||||||
Receivables, less allowance for credit losses of $1 and $1 at September 30, 2026 and December 31, 2025, respectively |
356 |
258 |
||||||
Due from affiliates |
19 |
17 |
||||||
Inventories, at average cost |
||||||||
Fuel |
29 |
38 |
||||||
Materials and supplies |
214 |
216 |
||||||
Regulatory assets |
100 |
226 |
||||||
Prepayments and other current assets |
45 |
38 |
||||||
Total current assets |
774 |
796 |
||||||
Other assets |
||||||||
Regulatory assets |
965 |
956 |
||||||
Other |
171 |
138 |
||||||
Total other assets |
1,136 |
1,094 |
||||||
Total assets |
$ |
14,965 |
$ |
14,071 |
||||
The accompanying notes are an integral part of the condensed financial statements.
4
TAMPA ELECTRIC COMPANY
Condensed Balance Sheets - continued
Unaudited
(millions) |
September 30, |
December 31, |
||||||
Liabilities and Capitalization |
2026 |
2025 |
||||||
Capitalization |
||||||||
Common stock |
$ |
6,105 |
$ |
5,635 |
||||
Accumulated other comprehensive loss |
0 |
(1 |
) |
|||||
Retained earnings |
351 |
219 |
||||||
Total capital |
6,456 |
5,853 |
||||||
Long-term debt |
4,534 |
4,531 |
||||||
Total capitalization |
10,990 |
10,384 |
||||||
Current liabilities |
||||||||
Notes payable |
885 |
773 |
||||||
Accounts payable |
360 |
366 |
||||||
Due to affiliates |
29 |
15 |
||||||
Customer deposits |
138 |
129 |
||||||
Regulatory liabilities |
126 |
114 |
||||||
Accrued interest |
48 |
42 |
||||||
Accrued taxes |
93 |
14 |
||||||
Other |
44 |
60 |
||||||
Total current liabilities |
1,723 |
1,513 |
||||||
Long-term liabilities |
||||||||
Deferred income taxes |
999 |
969 |
||||||
Regulatory liabilities |
759 |
727 |
||||||
Investment tax credits |
233 |
234 |
||||||
Finance lease liabilities |
48 |
48 |
||||||
Deferred credits and other liabilities |
213 |
196 |
||||||
Total long-term liabilities |
2,252 |
2,174 |
||||||
Commitments and Contingencies (see Note 8) |
||||||||
Total liabilities and capitalization |
$ |
14,965 |
$ |
14,071 |
||||
The accompanying notes are an integral part of the condensed financial statements.
5
TAMPA ELECTRIC COMPANY
Condensed Statements of Income and Comprehensive Income
Unaudited
Three months ended September 30, |
|||||||
(millions) |
2026 |
2025 |
|||||
Revenues |
|||||||
Electric |
$ |
893 |
$ |
921 |
|||
Expenses |
|||||||
Fuel |
205 |
151 |
|||||
Purchased power |
15 |
53 |
|||||
Operations and maintenance |
163 |
223 |
|||||
Depreciation and amortization |
134 |
128 |
|||||
Taxes, other than income |
71 |
66 |
|||||
Total expenses |
588 |
621 |
|||||
Income from operations |
305 |
300 |
|||||
Other income |
|||||||
Allowance for equity funds used during construction |
9 |
7 |
|||||
Other income, net |
5 |
7 |
|||||
Total other income |
14 |
14 |
|||||
Interest charges |
|||||||
Interest expense |
62 |
59 |
|||||
Allowance for borrowed funds used during construction |
(3 |
) |
(2 |
) |
|||
Total interest charges |
59 |
57 |
|||||
Income before provision for income taxes |
260 |
257 |
|||||
Provision for income taxes |
43 |
37 |
|||||
Net income |
$ |
217 |
$ |
220 |
|||
Other comprehensive income, net of tax |
|||||||
Gain on cash flow hedges |
1 |
0 |
|||||
Comprehensive income |
$ |
218 |
$ |
220 |
|||
The accompanying notes are an integral part of the condensed financial statements.
6
TAMPA ELECTRIC COMPANY
Condensed Statements of Income and Comprehensive Income
Unaudited
Nine months ended September 30, |
|||||||
(millions) |
2026 |
2025 |
|||||
Revenues |
|||||||
Electric |
$ |
2,557 |
$ |
2,409 |
|||
Expenses |
|||||||
Fuel |
515 |
394 |
|||||
Purchased power |
100 |
159 |
|||||
Operations and maintenance |
563 |
571 |
|||||
Depreciation and amortization |
405 |
374 |
|||||
Taxes, other than income |
206 |
187 |
|||||
Total expenses |
1,789 |
1,685 |
|||||
Income from operations |
768 |
724 |
|||||
Other income |
|||||||
Allowance for equity funds used during construction |
24 |
28 |
|||||
Other income, net |
15 |
19 |
|||||
Total other income |
39 |
47 |
|||||
Interest charges |
|||||||
Interest expense |
186 |
171 |
|||||
Allowance for borrowed funds used during construction |
(9 |
) |
(10 |
) |
|||
Total interest charges |
177 |
161 |
|||||
Income before provision for income taxes |
630 |
610 |
|||||
Provision for income taxes |
93 |
88 |
|||||
Net income |
$ |
537 |
$ |
522 |
|||
Other comprehensive income, net of tax |
|||||||
Gain on cash flow hedges |
1 |
0 |
|||||
Comprehensive income |
$ |
538 |
$ |
522 |
|||
The accompanying notes are an integral part of the condensed financial statements.
7
TAMPA ELECTRIC COMPANY
Condensed Statements of Cash Flows
Unaudited
Nine months ended September 30, |
|||||||
(millions) |
2026 |
2025 |
|||||
Cash flows from operating activities |
|||||||
Net income |
$ |
537 |
$ |
522 |
|||
Adjustments to reconcile net income to cash flows from operating activities: |
|||||||
Depreciation and amortization |
405 |
374 |
|||||
Deferred income taxes and investment tax credits |
2 |
(19 |
) |
||||
Allowance for equity funds used during construction |
(24 |
) |
(28 |
) |
|||
Deferred recovery clauses |
29 |
(68 |
) |
||||
Regulatory assets and liabilities |
160 |
194 |
|||||
Pension and postretirement asset and liabilities |
(9 |
) |
(11 |
) |
|||
Other |
4 |
(28 |
) |
||||
Changes in working capital: |
|||||||
Receivables, less allowance for credit losses |
(100 |
) |
(120 |
) |
|||
Inventories |
10 |
(2 |
) |
||||
Taxes accrued |
79 |
69 |
|||||
Interest accrued |
6 |
17 |
|||||
Accounts payable |
(25 |
) |
(259 |
) |
|||
Other |
(3 |
) |
(9 |
) |
|||
Cash flows from operating activities |
1,071 |
632 |
|||||
Cash flows used in investing activities |
|||||||
Capital expenditures |
(1,247 |
) |
(1,130 |
) |
|||
Net proceeds from sale of assets |
7 |
19 |
|||||
Cash flows used in investing activities |
(1,240 |
) |
(1,111 |
) |
|||
Cash flows from financing activities |
|||||||
Equity contributions from Parent |
470 |
400 |
|||||
Proceeds from long-term debt issuance |
0 |
593 |
|||||
Net increase (decrease) in short-term debt (maturities of 90 days or less) |
112 |
(126 |
) |
||||
Dividends to Parent |
(405 |
) |
(386 |
) |
|||
Cash flows from financing activities |
177 |
481 |
|||||
Net increase in cash and cash equivalents |
8 |
2 |
|||||
Cash and cash equivalents at beginning of period |
3 |
4 |
|||||
Cash and cash equivalents at end of period |
$ |
11 |
$ |
6 |
|||
Supplemental disclosure of non-cash investing and financing activities: |
|||||||
Change in accrued capital expenditures |
$ |
29 |
$ |
(24 |
) |
||
The accompanying notes are an integral part of the condensed financial statements.
8
TAMPA ELECTRIC COMPANY
Condensed Statements of Capital
Unaudited
Accumulated |
||||||||||||||||||||
Other |
||||||||||||||||||||
Common |
Retained |
Comprehensive |
Total |
|||||||||||||||||
(millions, except share amounts) |
Shares |
Stock |
Earnings |
Loss |
Capital |
|||||||||||||||
Three months ended September 30, 2026 |
||||||||||||||||||||
Balance at June 30, 2026 |
10 |
$ |
6,015 |
$ |
322 |
$ |
(1 |
) |
$ |
6,336 |
||||||||||
Net income |
217 |
217 |
||||||||||||||||||
Equity contributions from Parent |
90 |
90 |
||||||||||||||||||
Dividends to Parent |
(189 |
) |
(189 |
) |
||||||||||||||||
Other comprehensive income |
1 |
1 |
||||||||||||||||||
Other |
1 |
1 |
||||||||||||||||||
Balance at September 30, 2026 |
10 |
$ |
6,105 |
$ |
351 |
$ |
0 |
$ |
6,456 |
|||||||||||
Three months ended September 30, 2025 |
||||||||||||||||||||
Balance at June 30, 2025 |
10 |
$ |
5,380 |
$ |
322 |
$ |
(1 |
) |
$ |
5,701 |
||||||||||
Net income |
220 |
220 |
||||||||||||||||||
Equity contributions from Parent |
125 |
125 |
||||||||||||||||||
Dividends to Parent |
(188 |
) |
(188 |
) |
||||||||||||||||
Other |
(1 |
) |
(1 |
) |
||||||||||||||||
Balance at September 30, 2025 |
10 |
$ |
5,505 |
$ |
353 |
$ |
(1 |
) |
$ |
5,857 |
||||||||||
Nine months ended September 30, 2026 |
||||||||||||||||||||
Balance at December 31, 2025 |
10 |
$ |
5,635 |
$ |
219 |
$ |
(1 |
) |
$ |
5,853 |
||||||||||
Net income |
537 |
537 |
||||||||||||||||||
Equity contributions from Parent |
470 |
470 |
||||||||||||||||||
Dividends to Parent |
(405 |
) |
(405 |
) |
||||||||||||||||
Other comprehensive income |
1 |
1 |
||||||||||||||||||
Balance at September 30, 2026 |
10 |
$ |
6,105 |
$ |
351 |
$ |
0 |
$ |
6,456 |
|||||||||||
Nine months ended September 30, 2025 |
||||||||||||||||||||
Balance at December 31, 2024 |
10 |
5,105 |
218 |
(1 |
) |
5,322 |
||||||||||||||
Net income |
522 |
522 |
||||||||||||||||||
Equity contributions from Parent |
400 |
400 |
||||||||||||||||||
Dividends to Parent |
(386 |
) |
(386 |
) |
||||||||||||||||
Other |
(1 |
) |
(1 |
) |
||||||||||||||||
Balance at September 30, 2025 |
10 |
$ |
5,505 |
$ |
353 |
$ |
(1 |
) |
$ |
5,857 |
||||||||||
The accompanying notes are an integral part of the condensed financial statements.
9
TAMPA ELECTRIC COMPANY
NOTES TO CONDENSED FINANCIAL STATEMENTS
UNAUDITED
1. Summary of Significant Accounting Policies
See TEC’s Annual Report on Form 10-K for the year ended December 31, 2025 for a complete discussion of accounting policies. The significant accounting policies for TEC include the following:
Principles of Consolidation and Basis of Presentation
Tampa Electric Company (TEC or Tampa Electric) is engaged in the generation, purchase, transmission, distribution and sale of electric energy in West Central Florida. TEC maintains its accounts in accordance with recognized policies prescribed or permitted by the FPSC and the FERC. These policies conform with U.S. GAAP in all material respects. The use of estimates is inherent in the preparation of financial statements in accordance with U.S. GAAP. Actual results could differ from these estimates.
Prior to April 1, 2024, TEC was a wholly owned subsidiary of TECO Energy, which is an indirect, wholly owned subsidiary of Emera. On April 1, 2024, TECO Energy distributed its investment in TEC to TECO Holdings, Inc. in a transaction intended to qualify as a tax-free reorganization. This new corporation is also an indirect, wholly owned subsidiary of Emera. Therefore, TEC is an indirect, wholly owned subsidiary of Emera.
In the opinion of management, the unaudited condensed financial statements include all adjustments that are of a recurring nature and necessary to state fairly the financial position of TEC as of September 30, 2026 and December 31, 2025, and the results of operations and cash flows for the periods ended September 30, 2026 and 2025. The results of operations for the three and nine months ended September 30, 2026 are not necessarily indicative of the results that can be expected for the entire fiscal year ending December 31, 2026.
The Condensed Balance Sheet at December 31, 2025 was derived from audited financial statements; however, this quarterly report on Form 10-Q does not include all year-end disclosures required for an annual report on Form 10-K by U.S. GAAP.
Receivables and Allowance for Credit Losses
Receivables on the Condensed Balance Sheets include receivables from contracts with customers, which consist of services to residential, commercial, industrial and other customers, totaling $356 million and $258 million as of September 30, 2026 and December 31, 2025, respectively. An allowance for credit losses is established based on TEC’s collection experience and reasonable and supportable forecasts that affect the collectibility of the reported amount. Circumstances that could affect TEC’s estimates of credit losses include, but are not limited to, customer credit issues, generating fuel prices, customer deposits and general economic conditions. Accounts are reserved in the allowance or written off once they are deemed to be uncollectible.
As of September 30, 2026 and December 31, 2025, unbilled revenues of $105 million and $73 million, respectively, are included in the “Receivables” line item on the Condensed Balance Sheets.
Accounting for Franchise Fees and Gross Receipts
TEC is allowed to recover certain costs from customers on a dollar-for-dollar basis through rates approved by the FPSC. The amounts included in customers’ bills for franchise fees and gross receipt taxes are included as revenues on the Condensed Statements of Income. Franchise fees and gross receipt taxes payable by TEC are included as an expense on the Condensed Statements of Income in “Taxes, other than income”. These amounts totaled $43 million and $43 million for the three months ended September 30, 2026 and 2025, respectively, and totaled $115 million and $109 million for the nine months ended September 30, 2026 and 2025, respectively.
Investment and Production Tax Credits
ITCs have been recorded as deferred credits and are being amortized as reductions to income tax expense as required by regulatory practices. TEC recognizes a reduction of income tax expense for PTCs earned by its eligible solar assets. The PTCs are based on a per kilowatt-hour rate prescribed by applicable federal statutes.
TEC elects to account for the sale of tax credits in accordance with ASC 740, Income Taxes, and includes the discount from the sale of tax credits as a component of income tax expense. TEC includes any expected proceeds from the sale of tax credits in the evaluation of the realizability of its deferred tax assets and records a valuation allowance for the difference between the recorded deferred tax asset attributable to the credits and the expected proceeds. The sale of tax credits is presented in the operating activities section of the Condensed Statement of Cash Flows consistent with the presentation of taxes paid.
10
2. New Accounting Pronouncements
Disaggregation of Income Statement Expenses
In November 2024, the FASB issued ASU 2024-03, Income Statement Reporting–Comprehensive Income–Expense Disaggregation Disclosures (Subtopic 220-40), Disaggregation of Income Statement Expenses. The standard update improves the disclosures about a public business entity’s expenses by requiring more detailed information about the types of expenses (including purchases of inventory, employee compensation, depreciation and amortization) included within income statement expense captions. The guidance will be effective for annual reporting periods beginning after December 15, 2026, and interim reporting periods beginning after December 15, 2027. Early adoption is permitted. The standard updates are to be applied prospectively with the option for retrospective application. TEC is currently evaluating the impact of adoption of the standard update on its financial statement disclosures.
Targeted Improvements to the Accounting for Internal-Use Software
In September 2025, the FASB issued ASU 2025-06, Intangibles—Goodwill and Other—Internal-Use Software (Subtopic 350-40): Targeted Improvements to the Accounting for Internal-Use Software. The standard update modernizes accounting for internal-use software by eliminating references to project stages and clarifying the threshold to begin capitalizing costs. The standard update also specifies that the disclosure requirements under ASC 360, Property, Plant and Equipment, apply to capitalized software costs accounted for under ASC 350-40. The guidance will be effective for annual reporting periods beginning after December 15, 2027, and interim reporting periods within those annual reporting periods. Early adoption is permitted. The standard updates are to be applied using either a prospective, retrospective, or modified transition approach. TEC is currently evaluating the impact of adoption of the standard update on its financial statements.
Accounting for Government Grants Received by Business Entities
In December 2025, the FASB issued ASU 2025-10, Government Grants (Topic 832) – Accounting for Government Grants Received by Business Entities. The ASU adds guidance to ASC 832 on the recognition, measurement, and presentation of government grants. The guidance will be effective for annual reporting periods beginning after December 15, 2028, and interim reporting periods within those annual reporting periods. Early adoption is permitted. The standard updates are to be applied using either a modified prospective, modified retrospective, or full retrospective approach, as detailed in the ASU. TEC is currently evaluating the impact of adoption of the standard update on its financial statements.
Accounting for Environmental Credits and Environmental Credit Obligations
In May 2026, the FASB issued ASU 2026‑02, Environmental Credits and Environmental Credit Obligations (Topic 818). This ASU establishes new guidance for the recognition, measurement, presentation, and disclosure of environmental credits (such as renewable energy credits, carbon offsets, and similar instruments) and environmental credit obligations. The ASU is effective for fiscal years beginning after December 15, 2027, and interim periods within those fiscal years. Early adoption is permitted. An entity must apply the guidance retrospectively through a cumulative-effect adjustment to retained earnings. TEC is currently evaluating the impact of adoption of the standard update on its financial statements.
3. Regulatory
Base Rates
On April 2, 2024, Tampa Electric requested a base rate increase, reflecting an increased revenue requirement of $297 million, effective January 1, 2025, and additional adjustments of $100 million and $72 million for 2026 and 2027, respectively. Prior to the rate case hearing, Tampa Electric submitted revisions to its requested base rate increase to reflect items that included production tax credits, energy storage life expectancy, and the company’s grid reliability and resilience project. On December 3, 2024, the FPSC rendered a decision during a Special Agenda and the final order, reflecting such decision, was issued on February 3, 2025. The FPSC decision includes an increase of $185 million in 2025 and adjustments of $87 million and $9 million in 2026 and 2027, respectively. The decision also allowed for equity in the capital structure to continue to be 54% from investor sources of capital. The allowed regulatory ROE range is 9.50% to 11.50% with a 10.50% midpoint, effective January 1, 2025. On February 18, 2025, a motion for reconsideration on certain aspects of the rate case order was filed by an intervening party with the FPSC. On May 6, 2025, the FPSC denied the motion for reconsideration, except with respect to immaterial calculation corrections, and a final order was issued on June 11, 2025. On March 3, 2025, two intervening parties each filed a notice of appeal to the Florida Supreme Court regarding the outcome of Tampa Electric's 2024 base rate proceeding. On January 12, 2026, the intervening parties filed their briefs related to the appeal. On April 13, 2026, the FPSC
11
and TEC filed responses to the briefs. On October 7, 2026, the Florida Supreme Court heard oral arguments. To date, the Florida Supreme Court has not made a decision regarding this case.
On September 4, 2025, TEC petitioned the FPSC to increase base revenue by $88 million to reflect the 2026 adjustment in accordance with the 2024 rate case decision. On November 4, 2025, the FPSC approved the adjustment, with new rates becoming effective January 1, 2026.
On September 3, 2026, TEC petitioned the FPSC to increase base revenue by $9 million to reflect the 2027 adjustment in accordance with the 2024 rate case decision. TEC expects the FPSC to reach a decision in the fourth quarter of 2026.
2026 Settlement Agreement
On April 6, 2026, the FPSC established a docket for further study of certain purchased power costs recovered through the fuel adjustment clause. On April 15, 2026, TEC filed a petition with the FPSC seeking approval of revised depreciation rates for Bayside Station assets, which would decrease annual depreciation expense by approximately $20 million. On June 16, 2026, TEC and the Office of Public Counsel filed with the FPSC a motion to approve a settlement agreement in which this change to depreciation rates would be effective on July 1, 2026. In addition, as part of the settlement, TEC agreed to decrease fuel clause recovery by $10 million in 2026, which will be reflected on customer's bills in 2027. TEC also agreed to not seek approval for rates to collect additional base revenues that would be effective prior to January 1, 2028, except for previously approved subsequent year adjustments from the prior rate case and large load customer tariffs required by statute. On August 4, 2026, the FPSC approved the settlement agreement.
Large-load Customer Tariff
On September 30, 2026, TEC petitioned the FPSC for approval of large load customer tariffs in accordance with Florida’s data center law, Senate Bill 484, which requires public utilities to establish a minimum tariff and service requirement for large-load customers.
Storm Restoration Cost Recovery
In accordance with Tampa Electric’s 2021 rate case settlement agreement and with Tampa Electric's 2024 rate case order, in the event of a named storm that results in damage to its system, Tampa Electric can petition the FPSC to seek recovery of those costs over a 12-month period or longer as determined by the FPSC, as well as replenish its storm reserve regulatory liability of $56 million. Based on an FPSC order, if the charges to the storm reserve exceed the reserve liability account balance, the excess is to be carried as a regulatory asset. As of December 31, 2025, the balance in the regulatory asset for storm restoration costs was $116 million. As of September 30, 2026, the storm reserve liability account balance was $56 million.
Hurricane Helene made landfall on September 26, 2024. Tampa Electric was impacted by Hurricane Helene, resulting in a peak number of customers out of approximately 100,000. As of September 30, 2026, TEC deferred $48 million related to Hurricane Helene to the storm reserve for future recovery, with a minimal impact to earnings.
Hurricane Milton, the worst weather event to impact the area in over 100 years, made landfall on October 9, 2024. Tampa Electric was impacted by Hurricane Milton, resulting in a peak number of customers out of approximately 600,000. As of September 30, 2026, TEC deferred $334 million related to Hurricane Milton to the storm reserve for future recovery, with a minimal impact to earnings.
Restoration costs for the storms described above were deferred and were collected from customers. On February 4, 2025, the FPSC approved Tampa Electric’s petition filed on December 27, 2024 for the recovery, over an 18-month period beginning in March 2025, of $466 million to replenish the storm reserve for costs associated with Hurricane Idalia, Hurricane Debby, Hurricane Helene and Hurricane Milton and the associated interest, of which $440 million has been collected as of September 30, 2026. Based on the expected collection of the storm cost recovery amounts, on June 16, 2026, TEC notified the FPSC that the storm charge could be ended one month early, or after 17 months. The amount of cost-recovery is subject to a true-up mechanism with the FPSC, which TEC expects to file in the fourth quarter of 2026.
Regulatory Assets and Liabilities
Details of the regulatory assets and liabilities are presented in the following table:
12
(millions) |
September 30, 2026 |
December 31, 2025 |
|||||
Regulatory assets: |
|||||||
Regulatory tax asset (1) |
$ |
132 |
$ |
126 |
|||
Cost-recovery clauses (2) |
18 |
37 |
|||||
Capital cost recovery for early retired assets (3) |
538 |
530 |
|||||
Capital cost recovery for retired Polk Unit 1 components (4) |
120 |
129 |
|||||
Postretirement benefits (5) |
200 |
206 |
|||||
Storm reserve (6) |
0 |
116 |
|||||
Other |
57 |
38 |
|||||
Total regulatory assets |
1,065 |
1,182 |
|||||
Less: Current portion |
100 |
226 |
|||||
Long-term regulatory assets |
$ |
965 |
$ |
956 |
|||
Regulatory liabilities: |
|||||||
Regulatory tax liability (7) |
$ |
402 |
$ |
426 |
|||
Cost-recovery clauses - deferred balances (2) |
48 |
38 |
|||||
Accumulated reserve - cost of removal (8) |
329 |
315 |
|||||
Storm reserve (6) |
56 |
0 |
|||||
Deferred production tax credits (9) |
24 |
38 |
|||||
Other |
26 |
24 |
|||||
Total regulatory liabilities |
885 |
841 |
|||||
Less: Current portion |
126 |
114 |
|||||
Long-term regulatory liabilities |
$ |
759 |
$ |
727 |
|||
(1)
The regulatory tax asset is primarily associated with the depreciation and recovery of AFUDC-equity. This asset does not earn a return but rather is included in the capital structure, which is used in the calculation of the weighted cost of capital used to determine revenue requirements. It will be recovered over the expected regulatory life of the related assets.
(2)
These assets and liabilities are related to FPSC clauses and riders. They are recovered or refunded through cost-recovery mechanisms approved by the FPSC on a dollar-for-dollar basis in a subsequent period.
(3)
This regulatory asset is related to the remaining net book value and the associated dismantlement cost of Big Bend Units 1 through 3 and smart meter assets that were retired. The balance earns a rate of return as permitted by the FPSC and will be recovered as a separate line item on customer bills for a period of 15 years, beginning in 2022 through 2036.
(4)
This regulatory asset is related to the remaining net book value of certain components of Polk Unit 1 that were early retired on December 31, 2024. The balance earns a rate of return as permitted by the FPSC and will be recovered through base rates over an 11-year recovery period beginning on January 1, 2025.
(5)
This asset is related to the deferred costs of postretirement benefits and it is amortized over the remaining service life of plan participants. Deferred costs of postretirement benefits that are included in expense are recognized as cost of service for rate-making purposes as permitted by the FPSC.
(6)
See "Storm Restoration Cost Recovery" above for information regarding this reserve.
(7)
The regulatory tax liability is primarily related to the revaluation of TEC’s deferred income tax balances recorded on December 31, 2017 at the lower corporate income tax rate due to U.S. tax reform. The liability related to the revaluation of the deferred income tax balances is amortized and returned to customers through rate reductions or other revenue offsets based on IRS regulations and the settlement agreement for tax reform benefits approved by the FPSC.
(8)
This item represents the non-ARO cost of removal in the accumulated reserve for depreciation. AROs are costs for legally required removal of property, plant and equipment. Non-ARO cost of removal represents estimated funds received from customers through depreciation rates to cover future non-legally required cost of removal of property, plant and equipment, net of salvage value upon retirement, which reduces rate base for ratemaking purposes. This liability is reduced as costs of removal are incurred.
(9)
This regulatory liability represents the deferred benefit for PTCs available for qualifying solar facilities placed in service beginning January 1, 2022 through December 31, 2024, which reduced income tax expense and reduces rate base for ratemaking purposes. Following the recommendation of the FPSC, these PTC deferrals are being amortized over a three-year period starting in 2025.
13
4. Income Taxes
One Big Beautiful Bill Act
On July 4, 2025, H.R. 1 – One Big Beautiful Bill Act (OBBBA) was signed into law. The OBBBA makes permanent many of the expired and expiring tax provisions originally enacted in the Tax Cuts and Jobs Act of 2017. It also includes significant changes in future years to the timing and availability of several clean energy tax credits previously enacted in the Inflation Reduction Act, including the investment tax credit and production tax credit. On August 15, 2025, the IRS released guidance on determining when wind and solar projects have begun construction for purposes of qualifying for these tax credits. While TEC does not expect material current year impacts to its financial statements as a result of the OBBBA signed into law, TEC will continue to evaluate the future impact of this tax law as additional guidance becomes available.
Income Tax Expense
TEC is included in a consolidated U.S. federal income tax return with EUSHI and its subsidiaries. TEC’s income tax expense is based upon a standalone return method, modified for the benefits-for-loss allocation in accordance with EUSHI's tax sharing agreement. To the extent that TEC’s cash tax positions are settled differently than the amount reported as realized under the tax sharing agreement, the difference is accounted for as either a capital contribution or a distribution.
TEC’s effective tax rates for the nine months ended September 30, 2026 and 2025 were 14.8% and 14.4%, respectively. The September 30, 2026 and 2025 effective tax rates are an estimate of the annual effective income tax rate. TEC’s effective tax rate for the nine months ended September 30, 2026 and 2025 differed from the statutory rate principally due to the tax benefit from production tax credits and amortization of the regulatory tax liability resulting from tax reform. See Note 3 for further information regarding the regulatory tax liability.
Sale of Production Tax Credits
The Inflation Reduction Act established transferability markets for tax credits including solar PTCs and ITCs. During the third quarter of 2026, TEC recorded a valuation allowance of $6 million for the difference between the recorded deferred tax asset attributable to the credits and the expected proceeds. On October 2, 2026, TEC received cash in the amount of $34 million from the sale of PTCs.
5. Employee Postretirement Benefits
In 2024, TEC was a participant in the comprehensive retirement plans of TECO Energy, LLC (formerly known as TECO Energy, Inc. prior to April 1, 2024), including a qualified, non-contributory defined benefit retirement plan that covers substantially all employees. Subsequent to April 1, 2024, TECO Energy, LLC became a wholly owned subsidiary of the newly created TECO Holdings (see Note 1 for further detail). Effective January 1, 2025, the comprehensive retirement plans were transferred to TECO Holdings. Effective January 1, 2026, the active employees of New Mexico Gas Company and the benefits attributable to those active employees under the TECO Holdings Group Retirement Plan were transferred from this TECO Holdings plan to the New Mexico Gas Company Spin-off plan. On August 12, 2026, TECO Holdings completed a transaction to sell New Mexico Gas Company. As a result, a curtailment and a remeasurement of the NMGC Spin-off plan occurred in the third quarter of 2026. See curtailment-related line items in the tables below, which did not impact TEC's financial statements. The following table presents details related to TECO Holdings' periodic benefit cost for pension and other postretirement benefits. Amounts disclosed for TECO Holdings' pension benefits include the amounts related to its qualified pension plans and non-qualified, non-contributory SERP and Restoration Plan.
Details of TECO Holdings' benefit cost are presented in the following table:
14
(millions) |
Pension Benefits |
Other Postretirement Benefits |
|||||||||||||
Three months ended September 30, |
2026 |
2025 |
2026 |
2025 |
|||||||||||
Components of net periodic benefit cost |
|||||||||||||||
Service cost |
$ |
4 |
$ |
4 |
$ |
1 |
$ |
1 |
|||||||
Interest cost |
9 |
9 |
1 |
2 |
|||||||||||
Expected return on assets |
(13 |
) |
(13 |
) |
0 |
0 |
|||||||||
Amortization of actuarial loss (gain) |
3 |
2 |
(1 |
) |
(1 |
) |
|||||||||
Curtailment cost (1) |
4 |
0 |
0 |
0 |
|||||||||||
Net periodic benefit cost |
$ |
7 |
$ |
2 |
$ |
1 |
$ |
2 |
|||||||
Nine months ended September 30, |
|||||||||||||||
Components of net periodic benefit cost |
|||||||||||||||
Service cost |
$ |
14 |
$ |
13 |
$ |
1 |
$ |
1 |
|||||||
Interest cost |
27 |
27 |
5 |
5 |
|||||||||||
Expected return on assets |
(39 |
) |
(40 |
) |
0 |
0 |
|||||||||
Amortization of actuarial loss (gain) |
9 |
6 |
(1 |
) |
(1 |
) |
|||||||||
Curtailment cost (1) |
4 |
0 |
0 |
0 |
|||||||||||
Net periodic benefit cost |
$ |
15 |
$ |
6 |
$ |
5 |
$ |
5 |
|||||||
(1)
Represents pension-related costs associated with the New Mexico Gas Company Spin-off plan. Such costs were not recorded in TEC's financial statements, and therefore, had no impact on the results of operations.
TEC’s portion of the net periodic benefit cost for the three months ended September 30, 2026 and 2025, respectively, was $1 million and zero for pension benefits, and $1 million and $1 million for other postretirement benefits. TEC’s portion of the net periodic benefit cost for the nine months ended September 30, 2026 and 2025, respectively, was $5 million and $2 million for pension benefits, and $4 million and $4 million for other postretirement benefits. TEC’s portion of net periodic benefit costs for pension and other benefits is included as an expense on the Condensed Statements of Income in “Operations & maintenance”.
TECO Holdings assumed a long-term expected return on assets of 7.30% and a discount rate of 5.41% for pension benefits under its qualified pension plan for 2026. For TECO Holdings' other postretirement benefits, TECO Holdings used a discount rate of 5.71% for 2026.
TECO Holdings made contributions of $16 million and $18 million to its qualified pension plan in the nine months ended September 30, 2026 and 2025, respectively. TEC’s portion of these contributions was $12 million and $11 million during the nine months ended September 30, 2026 and 2025, respectively. TECO Holdings does not expect to make contributions to the pension plan for the remainder of 2026. See Note 1 for further information regarding TECO Holdings.
Included in the benefit cost discussed above, for the three and nine months ended September 30, 2026, $3 million and $7 million, respectively, of unamortized prior service benefits and costs and actuarial gains and losses were reclassified by TEC from regulatory assets to the Condensed Statement of Income, compared with $1 million and $4 million for the three and nine months ended September 30, 2025, respectively.
6. Short-Term Debt
Details of TEC’s short-term borrowings are presented in the following table:
September 30, 2026 |
December 31, 2025 |
||||||||||||||||||||||||||||||
Borrowings |
Borrowings |
Letters |
Borrowings |
Borrowings |
Letters |
||||||||||||||||||||||||||
Credit |
Outstanding - |
Outstanding - |
of Credit |
Credit |
Outstanding - |
Outstanding - |
of Credit |
||||||||||||||||||||||||
(millions) |
Facility |
Credit Facility (1) |
Commercial Paper (1) |
Outstanding |
Facility |
Credit Facility (1) |
Commercial Paper (1) |
Outstanding |
|||||||||||||||||||||||
5-year facility (2) |
$ |
1,200 |
$ |
0 |
$ |
885 |
$ |
1 |
$ |
1,200 |
$ |
0 |
$ |
773 |
$ |
1 |
|||||||||||||||
(1)
Borrowings outstanding are reported as notes payable.
(2)
On November 20, 2025, TEC amended the credit facility agreement to increase the capacity amount from $800 million to $1.2 billion and extend the maturity date to November 20, 2030. At December 31, 2025, TEC also had an active commercial paper program for up to $800 million, of which the full amount outstanding is backed by TEC’s credit facility. The amount of commercial paper issued results in an equal amount of its credit facility being considered drawn and unavailable. On January 22, 2026, TEC amended the commercial paper program to increase the amount to $1.2 billion from $800 million.
15
As of September 30, 2026, the credit facility required a commitment fee of 12.5 basis points. The weighted-average interest rate on borrowings outstanding under the credit facility and commercial paper at September 30, 2026 and December 31, 2025 was 4.2% and 4.0%, respectively.
As of September 30, 2026 and December 31, 2025, the carrying value of TEC’s short-term debt was not materially different from the fair value due to the short-term nature of the instruments and because the stated rates approximate market rates. The fair value of TEC’s short-term debt is determined using Level 2 measurements.
Commercial Paper Program
On May 25, 2021, TEC established a commercial paper program (the Program) under which TEC may issue on a private placement basis unsecured commercial paper notes (the Notes). On January 22, 2026, TEC amended the commercial paper program to increase the amount from $800 million to $1.2 billion. The maturities of the Notes will vary, but may not exceed 270 days from the date of issue. The rates of interest will depend on whether the Note will be a fixed or floating rate. TEC must have credit facilities in place, at least equal to the amount of its commercial paper program. TEC cannot issue commercial paper in an aggregate amount exceeding the then available capacity under its credit facility.
7. Long-Term Debt
Fair Value of Long-Term Debt
As of September 30, 2026, TEC’s long-term debt, including the current portion, had a carrying amount of $4,534 million and an estimated fair market value of $3,814 million. As of December 31, 2025, long-term debt had a carrying amount of $4,531 million and an estimated fair market value of $4,139 million. The fair value of the debt securities is determined using Level 2 measurements.
8. Commitments and Contingencies
Legal Contingencies
From time to time, TEC and its subsidiaries are involved in various legal, tax and regulatory proceedings before various courts, regulatory commissions and governmental agencies in the ordinary course of business. Where appropriate, accruals are made in accordance with accounting standards for contingencies to provide for matters that are probable of resulting in an estimable loss.
Long-Term Commitments
TEC has commitments for various purchases as disclosed below, including payment obligations under contractual agreements for fuel, fuel transportation and power purchases that are recovered from customers under regulatory clauses. The following is a schedule of future payments under net purchase obligations/commitments as of September 30, 2026:
Fuel |
Long-term |
Purchased |
||||||||||||||||||||||||||
Capital |
and |
Service |
Power |
|||||||||||||||||||||||||
(millions) |
Transportation |
Projects (1) |
Gas Supply |
Agreements |
Leases |
Agreements |
Total |
|||||||||||||||||||||
2026 |
$ |
37 |
$ |
83 |
$ |
53 |
$ |
4 |
$ |
1 |
$ |
3 |
$ |
181 |
||||||||||||||
2027 |
186 |
48 |
174 |
21 |
4 |
13 |
446 |
|||||||||||||||||||||
2028 |
144 |
28 |
81 |
20 |
4 |
13 |
290 |
|||||||||||||||||||||
2029 |
121 |
0 |
82 |
20 |
4 |
13 |
240 |
|||||||||||||||||||||
2030 |
115 |
5 |
0 |
22 |
4 |
13 |
159 |
|||||||||||||||||||||
Thereafter |
1,096 |
0 |
0 |
23 |
183 |
54 |
1,356 |
|||||||||||||||||||||
Total future minimum payments |
$ |
1,699 |
$ |
164 |
$ |
390 |
$ |
110 |
$ |
200 |
$ |
109 |
$ |
2,672 |
||||||||||||||
(1) These estimates are subject to continuing review and adjustment and actual capital expenditures may vary significantly from these estimates.
Debt Covenants
TEC must meet certain financial tests, including a debt to capital ratio, as defined in the applicable debt agreements and has certain restrictive covenants in specific agreements and debt instruments. As of September 30, 2026, TEC was in compliance with all required covenants.
16
9. Revenue
The following disaggregates TEC’s revenue by major source:
(millions) |
|||||||
Three months ended September 30, |
2026 |
2025 |
|||||
Electric revenue |
|||||||
Residential |
$ |
561 |
$ |
572 |
|||
Commercial |
233 |
234 |
|||||
Industrial |
50 |
51 |
|||||
Regulatory deferrals |
(35 |
) |
(26 |
) |
|||
Unbilled revenue |
(5 |
) |
1 |
||||
Other (1) |
89 |
89 |
|||||
Total revenue |
$ |
893 |
$ |
921 |
|||
Nine months ended September 30, |
2026 |
2025 |
|||||
Electric revenue |
|||||||
Residential |
$ |
1,451 |
$ |
1,370 |
|||
Commercial |
653 |
615 |
|||||
Industrial |
148 |
146 |
|||||
Regulatory deferrals |
(49 |
) |
(10 |
) |
|||
Unbilled revenue |
32 |
31 |
|||||
Other (1) |
322 |
257 |
|||||
Total revenue |
$ |
2,557 |
$ |
2,409 |
|||
(1)
Other electric revenue includes sales to public authorities, off-system sales to other utilities and various other items.
Remaining Performance Obligations
As allowed under ASC 606, TEC excludes contracts with an original expected length of one year or less and variable amounts for which the company recognizes revenue at the amount to which it has the right to invoice for services performed.
10. Segment Information
Segments are determined based on how TEC's chief operating decision maker (CODM) evaluates, measures and makes decisions with respect to the operations of the entity, resulting in segments based on products and services. TEC operates under a single operating and reportable segment because the operations of TEC only include the operations of the electric division. TEC is a public utility operating within the State of Florida and is engaged in the generation, purchase, transmission, distribution and sale of electric energy in West Central Florida.
TEC's CODM is the Chief Executive Officer. The CODM uses several measures to allocate capital and resources for TEC, predominantly in the annual budget and forecasting processes. The CODM evaluates performance by considering budget-to-actual variances for these measures monthly. The measure used by the CODM that is the most consistent with U.S. GAAP measurement principles is net income.
17
(millions) |
|||||||
Three months ended September 30, |
2026 |
2025 |
|||||
Revenues |
$ |
893 |
$ |
921 |
|||
Less: |
|||||||
Fuel |
205 |
151 |
|||||
Purchased power |
15 |
53 |
|||||
Operations and maintenance, excluding FPSC-approved regulatory deferrals |
103 |
101 |
|||||
Operations and maintenance related to FPSC-approved regulatory deferrals |
60 |
122 |
|||||
Depreciation and amortization |
134 |
128 |
|||||
Interest charges |
59 |
57 |
|||||
Other segment items (1) |
57 |
52 |
|||||
Provision for income taxes |
43 |
37 |
|||||
Net income |
$ |
217 |
$ |
220 |
|||
Capital expenditures |
$ |
433 |
$ |
362 |
|||
Nine months ended September 30, |
|||||||
Revenues |
$ |
2,557 |
$ |
2,409 |
|||
Less: |
|||||||
Fuel |
515 |
394 |
|||||
Purchased power |
100 |
159 |
|||||
Operations & maintenance, excluding FPSC-approved regulatory deferrals |
311 |
298 |
|||||
Operations & maintenance related to FPSC-approved regulatory deferrals |
252 |
273 |
|||||
Depreciation and amortization |
405 |
374 |
|||||
Interest charges |
177 |
161 |
|||||
Other segment items (1) |
167 |
140 |
|||||
Provision for income taxes |
93 |
88 |
|||||
Net income |
$ |
537 |
$ |
522 |
|||
Capital expenditures |
$ |
1,247 |
$ |
1,130 |
|||
Total assets at September 30, 2026 |
$ |
14,965 |
|||||
Total assets at December 31, 2025 |
$ |
14,071 |
|||||
(1) Other segment items include taxes other than income, partially offset by AFUDC and other income, net.
18
Item 2. MANAGEMENT’S DISCUSSION & ANALYSIS OF FINANCIAL CONDITION & RESULTS OF OPERATIONS
Operating Company Results
Amounts included below are pre-tax, except net income and income taxes.
TEC’s net income for the third quarter of 2026 was $217 million, compared with $220 million for the same period in 2025. Results primarily reflected higher base revenues resulting from the subsequent year adjustment in the 2024 rate case, offset by a one-time reduction in recoverable fuel and purchased power costs (see Note 3 of the TEC Condensed Financial Statements for further information), higher depreciation and higher taxes. Base revenues are energy sales excluding revenues from clauses, gross receipts taxes and franchise fees. Clauses, gross receipts taxes and franchise fees do not have a material effect on net income as these revenues substantially represent a dollar-for-dollar recovery of clause and other pass-through costs.
Revenues for the third quarter of 2026 were $28 million lower than in the same period in 2025, driven by the reduction of storm surcharge revenue and unfavorable weather compared to the same period in 2025, partially offset by higher base revenue due to new base rates as a result of the subsequent year adjustment in the 2024 rate case and customer growth. Total degree days (a measure of heating and cooling demand) in TEC's service area in the third quarter of 2026 were consistent with normal (a 20-year statistical degree day average) and 5% below the 2025 period, reflecting milder weather in the third quarter of 2026 compared to 2025.
O&M expense for the third quarter of 2026 was $60 million lower than in 2025 primarily due to lower storm cost recognition of $62 million related to storm surcharge revenue (offset in revenue). Depreciation and amortization expense increased $6 million for the third quarter of 2026 compared to 2025 as a result of additions to facilities and the in-service of capital projects, partially offset by the approval of the revised Bayside Station depreciation rates (see Note 3 of the TEC Condensed Financial Statements for further information).
TEC’s net income year-to-date 2026 was $537 million, compared with $522 million for the same period in 2025. Results primarily reflected higher base revenues resulting from the subsequent year adjustment in the 2024 rate case and additional storm protection plan return on investment, partially offset by higher depreciation, interest and operational expenses.
Revenues were $148 million higher than year-to-date 2025 primarily driven by higher base revenue due to new base rates as a result of the subsequent year adjustment in the 2024 rate case, increased off-system sales, increased regulatory deferral revenue, customer growth, and favorable weather compared to the same period in 2025. Total degree days (a measure of heating and cooling demand) in TEC's service area year-to-date 2026 were 8% above normal (a 20-year statistical degree day average) and 1% above the 2025 period, reflecting favorable weather year-to-date in 2026 compared to 2025. Results also reflect a 1% increase in the number of customers year-to-date in 2026 compared to the same period in 2025.
O&M expense was $8 million lower than year-to-date 2025 due to lower storm cost recognition of $15 million related to storm surcharge revenue (offset in revenue) and decreased regulatory deferrals of $6 million, partially offset by increased operational expenses of $13 million. The increase in operating expenses was primarily due to generation outages. Depreciation and amortization expense increased $31 million year-to-date 2026 compared to the same period in 2025 primarily due to additions to facilities and the in-service of capital projects.
TEC’s regulated operating statistics for the three and nine months ended September 30, 2026 and 2025 were as follows:
19
(millions, except total degree days) |
Operating Revenues |
Kilowatt-Hours Billed |
||||||||||||||||||||||
Three months ended September 30, |
2026 |
2025 |
% Change |
2026 |
2025 |
% Change |
||||||||||||||||||
By Customer Type |
||||||||||||||||||||||||
Residential (1) |
$ |
561 |
$ |
572 |
(2 |
) |
3,278 |
3,249 |
1 |
|||||||||||||||
Commercial (1) |
233 |
234 |
(0 |
) |
1,905 |
1,872 |
2 |
|||||||||||||||||
Industrial (1) |
50 |
51 |
(2 |
) |
532 |
544 |
(2 |
) |
||||||||||||||||
Other (1) |
68 |
69 |
(1 |
) |
539 |
546 |
(1 |
) |
||||||||||||||||
Regulatory deferrals and unbilled revenue (2) |
(40 |
) |
(25 |
) |
60 |
|||||||||||||||||||
Total retail sales of electricity |
872 |
901 |
(3 |
) |
6,254 |
6,211 |
1 |
|||||||||||||||||
Off system sales of electricity |
4 |
1 |
300 |
95 |
59 |
61 |
||||||||||||||||||
Other operating revenue |
17 |
19 |
(11 |
) |
||||||||||||||||||||
Total revenues |
$ |
893 |
$ |
921 |
(3 |
) |
6,349 |
6,270 |
1 |
|||||||||||||||
By Sales Type |
||||||||||||||||||||||||
Base |
$ |
520 |
$ |
496 |
5 |
|||||||||||||||||||
Clause |
256 |
248 |
3 |
|||||||||||||||||||||
Capital cost recovery for early retired assets |
20 |
21 |
(5 |
) |
||||||||||||||||||||
Storm surcharge |
32 |
94 |
(66 |
) |
||||||||||||||||||||
Gross receipts taxes and franchise fees |
43 |
43 |
0 |
|||||||||||||||||||||
Other |
22 |
19 |
16 |
|||||||||||||||||||||
Total revenues |
$ |
893 |
$ |
921 |
(3 |
) |
||||||||||||||||||
Retail net energy for load (kilowatt hours) |
6,496 |
6,549 |
(1 |
) |
||||||||||||||||||||
Total degree days |
1,718 |
1,806 |
(5 |
) |
||||||||||||||||||||
(millions, except customers and total degree days) |
Operating Revenues |
Kilowatt-Hours Billed |
||||||||||||||||||||||
Nine months ended September 30, |
2026 |
2025 |
% Change |
2026 |
2025 |
% Change |
||||||||||||||||||
By Customer Type |
||||||||||||||||||||||||
Residential (1) |
$ |
1,451 |
$ |
1,370 |
6 |
8,051 |
7,967 |
1 |
||||||||||||||||
Commercial (1) |
653 |
615 |
6 |
4,992 |
4,931 |
1 |
||||||||||||||||||
Industrial (1) |
148 |
146 |
1 |
1,532 |
1,597 |
(4 |
) |
|||||||||||||||||
Other (1) |
197 |
188 |
5 |
1,479 |
1,483 |
(0 |
) |
|||||||||||||||||
Regulatory deferrals and unbilled revenue (2) |
(17 |
) |
21 |
(181 |
) |
- |
||||||||||||||||||
Total retail sales of electricity |
2,432 |
2,340 |
4 |
16,054 |
15,978 |
0 |
||||||||||||||||||
Off system sales of electricity |
60 |
15 |
300 |
347 |
328 |
6 |
||||||||||||||||||
Other operating revenue |
65 |
54 |
20 |
|||||||||||||||||||||
Total revenues |
$ |
2,557 |
$ |
2,409 |
6 |
16,401 |
16,306 |
1 |
||||||||||||||||
By Sales Type |
||||||||||||||||||||||||
Base |
$ |
1,396 |
$ |
1,320 |
6 |
|||||||||||||||||||
Clause |
692 |
668 |
4 |
|||||||||||||||||||||
Capital cost recovery for early retired assets |
52 |
53 |
(2 |
) |
||||||||||||||||||||
Storm surcharge |
176 |
191 |
(8 |
) |
||||||||||||||||||||
Gross receipts taxes and franchise fees |
115 |
109 |
6 |
|||||||||||||||||||||
Other |
126 |
68 |
85 |
|||||||||||||||||||||
Total revenues |
$ |
2,557 |
$ |
2,409 |
6 |
|||||||||||||||||||
Customers at September 30, (thousands) |
873 |
864 |
1 |
|||||||||||||||||||||
Retail net energy for load (kilowatt-hours) |
17,077 |
17,052 |
0 |
|||||||||||||||||||||
Total degree days |
3,902 |
3,868 |
1 |
|||||||||||||||||||||
(1)
Reflects a billing cycle measurement.
(2)
Primarily reflects unbilled revenue, which incorporates a calendar measurement, and postings for clause recovery deferrals.
20
Other Income
For the third quarter of 2026 and 2025, respectively, TEC’s other income was $14 million and $14 million, which included AFUDC-equity of $9 million and $7 million and other income of $5 million and $7 million. For the year-to-date periods in 2026 and 2025, respectively, TEC’s other income was $39 million and $47 million, which included AFUDC-equity of $24 million and $28 million and other income of $15 million and $19 million. The increase in AFUDC-equity in the third quarter of 2026 compared to the third quarter of 2025 is due primarily due to the timing of solar and the Big Bend Unit 1 modernization project. The decrease in AFUDC-equity in year-to-date compared to the same period in 2025 is due to the in-service of resiliency projects no longer under construction.
Interest Expense
For the third quarter of 2026 and 2025, TEC’s interest expense, excluding AFUDC-debt, was $62 million and $59 million, respectively. For the year-to-date periods in 2026 and 2025, TEC’s interest expense, excluding AFUDC-debt, was $186 million and $171 million, respectively. The increase is due to higher borrowings, primarily in support of TEC's capital program.
Income Taxes
The provisions for income taxes were $43 million and $37 million for the three months ended September 30, 2026 and 2025, respectively, and $93 million and $88 million for the nine months ended September 30, 2026 and 2025, respectively. Compared to the 2025 periods, the increase in the provision for income taxes for the three and nine months ended September 30, 2026 was primarily due to higher pre-tax income and a valuation allowance recorded for the discount on PTCs to be sold (as discussed further in Note 4 of the TEC Condensed Financial Statements), partially offset by higher benefit from production tax credits related to solar facilities.
Liquidity and Capital Resources
The table below sets forth the September 30, 2026 liquidity, cash balances and amounts available under the TEC credit facilities.
(millions) |
|||||
Credit facilities/ commercial paper |
$ |
1,200 |
|||
Drawn amounts/letters of credit |
(886 |
) |
|||
Available credit facilities |
314 |
||||
Cash |
11 |
||||
Total liquidity |
$ |
325 |
|||
Cash Impacts Related to Operating Activities
Cash flows from operating activities in the nine months ended September 30, 2026 were $1,071 million, an increase of $439 million compared to the same period in 2025. Increases to cash from operations were primarily due to higher 2025 payments related to the 2024 storm season and lower fuel costs in 2026.
Cash Impacts Related to Financing Activities
Cash flows from financing activities for the nine months ended September 30, 2026 resulted in net cash inflows of $177 million. TEC received $470 million of equity contributions from Parent and $112 million of net receipts of short-term debt with maturities of 90 days or less, partially offset by $405 million of dividends to Parent.
Covenants in Financing Agreements
In order to utilize its bank credit facilities, TEC must meet certain financial tests as defined in the applicable agreements. In addition, TEC has certain restrictive covenants in specific agreements and debt instruments. As of September 30, 2026, TEC was in compliance with all applicable financial covenants. The following table contains the significant financial covenant and the performance relative to it as of September 30, 2026.
Significant Financial Covenants
Calculation at |
||||||
Instrument (1) |
Financial Covenant (2) |
Requirement/Restriction |
September 30, 2026 |
|||
Credit facility - $1,200 million |
Debt/capital |
Cannot exceed 65% |
45.6% |
21
(1)
See Note 6 to the TEC Condensed Financial Statements for details of the credit facility.
(2)
As defined in the instrument.
Credit Ratings of Senior Unsecured Debt as of September 30, 2026
S&P |
Moody’s |
Fitch |
|||||
Credit ratings of senior unsecured debt |
BBB+ |
A3 |
A |
||||
Credit ratings outlook |
Stable |
Stable |
Stable |
Certain of TEC’s derivative instruments contain provisions that require TEC’s debt to maintain investment-grade credit ratings.
Commitments and Contingencies
See Note 8 to the TEC Condensed Financial Statements for information regarding TEC’s commitments and contingencies as of September 30, 2026.
Regulatory Matters
See Note 3 to the TEC Condensed Financial Statements for information regarding TEC’s regulatory matters.
Fair Value Measurements
TEC considered the impact of nonperformance risk in determining the fair value of derivatives. TEC considered the net position with each counterparty, past performance and the intent of the parties, indications of credit deterioration and whether the markets in which TEC transacts have experienced dislocation. As of September 30, 2026, the fair value of derivatives was not materially affected by nonperformance risk.
Critical Accounting Policies and Estimates
Critical accounting policies and estimates have not materially changed in 2026. For further discussion of critical accounting policies and estimates, see TEC’s Annual Report on Form 10-K for the year ended December 31, 2025.
Item 3. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
Information required by Item 3 is omitted pursuant to General Instruction H(2) of Form 10-Q.
Item 4. CONTROLS AND PROCEDURES
(a)
Evaluation of Disclosure Controls and Procedures. TEC’s management, with the participation of its principal executive officer and principal financial officer, has evaluated the effectiveness of TEC’s disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act) as of September 30, 2026. Based on such evaluation, TEC’s principal financial officer and principal executive officer have concluded that, as of September 30, 2026, TEC’s disclosure controls and procedures are effective.
(b)
Changes in Internal Controls. There was no change in TEC’s internal controls over financial reporting (as defined in Rules 13a–15(f) and 15d-15(f) under the Exchange Act) identified in connection with the evaluation of TEC’s internal control over financial reporting that occurred during TEC’s last fiscal quarter that has materially affected, or is reasonably likely to materially affect, such controls.
22
PART II. OTHER INFORMATION
Item 1. LEGAL PROCEEDINGS
From time to time, TEC is involved in various legal, tax and regulatory proceedings before various courts, regulatory commissions and governmental agencies in the ordinary course of business. Where appropriate, accruals are made in accordance with accounting standards for contingencies to provide for matters that are probable of resulting in an estimable loss. For a discussion of legal proceedings and environmental matters, see Note 8 of the TEC Condensed Financial Statements.
Item 6. EXHIBITS
Exhibit |
|||
No. |
Description |
||
3.1 |
Restated Articles of Incorporation of Tampa Electric Company, as amended on November 30, 1982 (Exhibit 3 to Registration Statement No. 2-70653 of Tampa Electric Company). (P) |
* |
|
3.2 |
* |
||
31.1 |
|||
31.2 |
|||
32 |
|||
101.INS** |
Inline XBRL Instance Document - the instance document does not appear in the Interactive Data File because its XBRL tags are embedded within the inline XBRL document. |
||
101.SCH** |
Inline XBRL Taxonomy Extension Schema Document with Embedded Linkbase Documents. |
||
101.CAL** |
Inline XBRL Taxonomy Extension Calculation Linkbase Document. |
||
101.DEF** |
Inline XBRL Taxonomy Extension Definition Linkbase Document. |
||
101.LAB** |
Inline XBRL Taxonomy Label Linkbase Document. |
||
101.PRE** |
Inline XBRL Taxonomy Presentation Linkbase Document. |
||
104 |
Cover Page Interactive Data File (formatted in Inline XBRL and contained in Exhibit 101). |
(1)
This certification accompanies the Quarterly Report on Form 10-Q and is not filed as part of it.
* Indicates exhibit previously filed with the Securities and Exchange Commission and incorporated herein by reference. Exhibits filed with periodic reports of TECO Energy, Inc. and TEC were filed under Commission File Nos. 1-8180 and 1-5007, respectively.
** The XBRL related information in Exhibit 101 to this quarterly report on Form 10-Q shall not be deemed “filed” for purposes of Section 18 of the Securities Exchange Act of 1934, as amended, or otherwise subject to liability of that section and shall not be incorporated by reference into any filing or other document pursuant to the Securities Act of 1933, as amended, except as shall be expressly set forth by specific reference in such filing or document.
23
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
TAMPA ELECTRIC COMPANY |
||||
(Registrant) |
||||
Date: November 6, 2026 |
By: |
/s/ JARED GREEN |
||
Jared Green |
||||
Treasurer and Chief Financial Officer |
||||
(Principal Financial and Accounting Officer) |
||||
24